Zim Now Writer
The Zimbabwe National Roads Administration, has suspended operations at Triangle and Magamba tollgates with immediate effect.
In a notice by Zinara dated 31 December 2022, the tollgates were suspended in terms of Statutory Instrument 219 of 2022.
“The suspension of operations at these tollgates is part of our continuous operational review. Zinara takes this opportunity to thank its motoring public for their continued cooperation,” reads the notice.
Triangle Tollgate is located 9km before Triangle, along the Ngundu-Tanganda road in the lowveld.
The other tollgate that was suspended, Magamba tollgate, lies 17.5 kilometres from Chivhu, along the Chivhu-Nyazura road.
Leave Comments